Wood-based panel production plants - Milestones
 
 1990

 First continuous press type CPS.

 
 1995

 Largest multi-daylight press of the world.
 First 12-foot OSB plant.

 
 1996

 Largest continuous MDF press of the world - 900 m3/d.

 
 1997

 First continuous production line for LVL.
 Quickest short-cycle lamination plant of the world.
 First online service support system.
 First MDF plant using recycled wood only.

 
 1998

 Longest continuous MDF press.
 Largest particleboard plant for recycled wood in the world - 2.000 m3/d.

 
 2000

 First continuous 12-ft OSB production line in the world, with a 56 m CPS press.

 
 2001

 First high-performance plant for the production of MDF/HDF thin boards
 1.6 - 9.5 mm in USA.

 
 2002

 THDF-line produces at speeds above 1,300 mm/s.

 
 2003

 New concept for thin fiber board lines.

 
 2004

 New hot steam fiber drier.
 Steam pre-heating used in a particleboard line for the first time.

 
 2005

 Steam pre-heating allows production of OSL boards on continuous presses.

 
 2006

 Dieffenbacher develops a fibreboard technology with formaldehyde emissions
 cut to practically zero.
 Dieffenbacher presents the Concept 3000: "Particle board line with 3000 m³
 daily output".

 
 2007

 Thermobooster for MDF.

 
 
  Return to menu